NFPA 70B programs

Your electrical compliance, handled. One plan, one price, one record.

An annual program that covers what NFPA 70B and 70E expect from your critical power: twice-yearly infrared on the gear that matters most, an annual full scan, arc flash on its five-year cycle, and one running record you can hand an auditor.

Why it matters

NFPA 70B is now a standard. Most sites are still running it like a suggestion.

NFPA 70B is a required standard, not a recommended practice. The 2026 edition expects an electrical maintenance program with 11 defined elements, documented equipment condition, defined inspection intervals and repair timelines set by severity. A one-off scan a year doesn't show a program. A plan and a record do.

  • 01

    Don't think about it again

    Visits are scheduled for the year, the arc flash clock is tracked, and nothing depends on someone remembering to re-quote.

  • 02

    Budget once

    A fixed annual price replaces a string of separate approvals, and spreads larger items like arc flash updates across years.

  • 03

    One audit trail

    Every scan, finding, repair and re-scan in one record, so the answer to 'show me your program' is a single document.

Scope

What's in the program.

Built from four pieces. Each is there because a standard, an insurer or your uptime calls for it.

Twice-yearly infrared

  • Critical gear every six months
  • UPS, PDU, STS and busway
  • Because these fail fastest under load
  • Scheduled for the year in advance

Annual full scan

  • The entire electrical path
  • Meets NFPA 70B's 12-month interval
  • Cooling equipment on request
  • Report formatted for insurers

Arc flash on cycle

  • Study or update in the plan
  • Tracked to the 5-year review
  • Updates after major changes
  • Labels kept current

One record

  • Findings log with severity class
  • Repair re-scans close each item
  • Year-over-year asset trending
  • Program summary for audits

What you get

What changes for your team.

A calendar, not a scramble

Every visit for the year agreed up front, timed around your maintenance windows.

One annual price

Approved once. No re-quoting each visit, no surprise line items.

Nothing goes overdue

We track scan intervals and the arc flash review date so you don't have to.

Findings get closed

Each finding is tracked until a re-scan under load proves the repair.

An answer for auditors

A program summary that shows coverage, intervals, findings and closeouts in one place.

Same team every visit

Thermographers who know your site, your MOP and your gear's history.

NFPA 70B (2026)NFPA 70ENEC 110.16Insurer-ready reportingFixed annual priceMulti-site portfolios
Of infrared thermography
30 yrs
Of critical capacity scanned annually
1+ GW
Components scanned
500,000+
Infrared inspections
10,000+
States scanned
45+

FAQ

NFPA 70B programs: common questions

How often should a data center have an infrared scan?

At least once a year, and we recommend twice a year on critical distribution gear. NFPA 70B (2026 edition) calls for infrared thermography of electrical equipment at least every 12 months and shorter intervals when equipment condition warrants it. Most data center operators scan the full electrical path once a year. We recommend adding a mid-year scan of UPS, PDU, STS and busway, the gear closest to IT load.

What does the report include?

Every inspected component is listed by location, with thermal and visual images for every finding, the measured temperature rise, a severity class from 1 (normal) to 4 (immediate action), and a recommended corrective action. The report is formatted for NFPA 70B records, insurer submissions and audits. Partners can receive it under their own brand.

What is the difference between an infrared scan and an arc flash study?

An infrared scan finds equipment that is failing now: loose connections, overloaded circuits and failing components that run hot. An arc flash study calculates how much energy a fault would release at each piece of gear, so workers know the hazard and the PPE required. NFPA 70E requires the arc flash risk assessment to be reviewed at least every five years. Most facilities need both.

How often does an arc flash study need to be updated?

At least every five years under NFPA 70E, and sooner whenever there is a major modification: new utility service, new UPS or generator capacity, a change in protective device settings or a re-feed. Labels must match the current study.

What is an NFPA 70B program and why is it priced annually?

It packages what NFPA 70B and 70E expect into one plan: twice-yearly infrared on critical gear, an annual full scan, arc flash study and label updates on the five-year cycle, and one running record of findings and repairs. Pricing is a fixed annual amount, so the work is budgeted once and does not have to be re-approved every visit.

Next step

Tell us about your site.

Send a gear list, a one-line or just the address. We scope it with you, and you get a written scope and price, usually within one business day.