Arc flash studies

Arc flash studies, stamped and labeled. Updated before they expire.

An arc flash study tells every worker on your site how much energy a fault would release at each piece of gear and what PPE they need. Ours are engineered and stamped by a licensed PE, with equipment data collected by the same team that scans your gear.

Why it matters

If the labels don't match the system, the study isn't protecting anyone.

Data centers change constantly: new UPS capacity, added generators, a re-feed, a new tenant load. Each change can move the incident energy at downstream gear. NFPA 70E requires the arc flash risk assessment to be reviewed at least every five years and whenever the system changes.

  • 01

    Required, not optional

    NFPA 70E requires an arc flash risk assessment before work on energized equipment, and NEC 110.16 requires the warning labels.

  • 02

    Five-year clock

    The assessment must be reviewed at least every five years, and sooner after major modifications. Many sites are overdue and don't know it.

  • 03

    Fewer site visits

    We collect study data while we're already on site for infrared, so your team escorts one crew instead of two.

Scope

From field data to labels on the gear.

A complete study, or an update to an existing one after changes or at the five-year mark.

Field data collection

  • Equipment nameplates and ratings
  • Protective device types and settings
  • Conductor sizes and lengths
  • Utility fault current data
  • One-line verification against the field

Engineering

  • Short-circuit study
  • Protective device coordination
  • Incident energy analysis
  • Recommendations to reduce hazard
  • Stamped by a licensed PE

On the gear

  • NEC 110.16 arc flash labels
  • Printed and installed
  • Updated one-line diagram
  • Five-year review schedule
  • Updates after modifications

What you get

A study your safety program can rely on.

Stamped study report

Short-circuit, coordination and incident energy results with the engineer's stamp.

Labels on every piece of gear

Incident energy, arc flash boundary and PPE category, printed and installed.

Verified one-line

Your one-line diagram corrected to match what's actually in the field.

Hazard-reduction options

Setting changes and practical options to bring high-energy locations down.

Five-year tracking

We track the review date and flag changes that trigger an update before an audit does.

Paired with infrared

Combine with your annual scan to share site time, escorts and MOP approval.

NFPA 70ENEC 110.16IEEE 1584 calculationsPE-stamped5-year review cycleNationwide
Of infrared thermography
30 yrs
Of critical capacity scanned annually
1+ GW
Components scanned
500,000+
Infrared inspections
10,000+
States scanned
45+

FAQ

Arc flash studies: common questions

What is the difference between an infrared scan and an arc flash study?

An infrared scan finds equipment that is failing now: loose connections, overloaded circuits and failing components that run hot. An arc flash study calculates how much energy a fault would release at each piece of gear, so workers know the hazard and the PPE required. NFPA 70E requires the arc flash risk assessment to be reviewed at least every five years. Most facilities need both.

Who signs the arc flash study?

Studies are engineered and stamped by a licensed professional engineer. Our field team collects the equipment data, often during the same visit as your infrared scan, which cuts site time and cost.

How often does an arc flash study need to be updated?

At least every five years under NFPA 70E, and sooner whenever there is a major modification: new utility service, new UPS or generator capacity, a change in protective device settings or a re-feed. Labels must match the current study.

Next step

Tell us about your site.

Send a gear list, a one-line or just the address. We scope it with you, and you get a written scope and price, usually within one business day.