UPS battery services
UPS battery testing, maintenance and replacement.
Your UPS is only as strong as its weakest jar. We test every jar in every string, trend it against its own baseline and replace on a plan, not in an outage. VRLA, wet cell, Ni-Cd and lithium-ion, nationwide, under your MOP.
Example readout. Values illustrative.
Why it matters
One weak jar can drop the whole string.
A UPS battery string is wired in series. When utility power drops, every jar has to carry the critical load until the generators pick it up. One jar with high internal resistance can collapse the string at exactly that moment, and it can look normal on float right up until then. UPS failures are the most commonly cited cause of power-related IT outages: 39% in Uptime Institute's 2026 resiliency survey.
- 01
Float voltage isn't a health check
A jar can hold a normal float voltage and still fail under discharge. Ohmic trending and capacity testing show what a voltmeter can't.
- 02
Replace on a plan, not after a failure
Trended readings show which jars and strings are aging out, so replacement becomes a budgeted project in a planned window instead of an emergency.
- 03
Meet the standard
NFPA 70B has a dedicated chapter for stationary standby batteries, and IEEE 1188, revised in 2025, sets the test schedule for VRLA. Auditors and insurers ask for the records.
Scope
Every jar, every string, every chemistry.
Scope is built from your UPS and battery list. You set the visit cadence; we recommend one based on chemistry, age and how critical the load is.
Testing & diagnostics
- Internal ohmic (impedance) testing of every jar
- Intercell and terminal connection resistance
- Float voltage, charge current and AC ripple
- Capacity and load bank discharge testing
- Infrared of terminals and connections
Preventive maintenance
- Quarterly, semi-annual or annual visits
- Cases, seals, corrosion, leaks and swelling
- Cleaning and re-torque to manufacturer spec
- Cabinet, rack and ventilation checks
- Lithium-ion BMS log download and review
Installation & replacement
- Full string and cabinet replacements
- Individual jar replacement, matched to the string
- Installed and torqued to OEM spec
- Acceptance testing of every new string
- Removal, recycling and certificate of recycling
Monitoring & response
- Battery monitoring system installation
- Alarm and out-of-limit review
- Emergency jar and string replacement
- Re-test after every replacement
What you get
A battery record you can trend, budget and hand to an auditor.
Every jar, every reading
Voltage, ohmic value and temperature for each jar, organized by UPS, cabinet and string, so coverage is provable.
Trended against baseline
Each jar is compared with its own history and the string average, so a jar that's climbing shows up before it fails.
Clear calls: replace, watch or OK
Every out-of-limit jar is flagged with a recommended action and priority your team can turn into a work order.
A replacement forecast
Which strings are approaching end of life, so batteries are planned a budget cycle ahead instead of bought in a rush.
Install and recycling records
Battery models, quantities, install dates, acceptance test results and a certificate of recycling for everything removed.
Infrared on the same visit
Add an infrared scan of the UPS, battery cabinets and connections. One team, one visit, one record.
- Of infrared thermography
- 30 yrs
- Of critical capacity scanned annually
- 1+ GW
- Components scanned
- 500,000+
- Infrared inspections
- 10,000+
- States scanned
- 45+
Related guides
Read before you scope it.
How often should data center UPS batteries be tested? Intervals, tests and replacement triggers
Quarterly ohmic checks, yearly connection checks and capacity tests on cycle. How data centers schedule UPS battery testing under IEEE 1188, IEEE 450 and NFPA 70B.
Read the guideHow often does a data center need an infrared scan? NFPA 70B intervals, explained
NFPA 70B (2026) calls for infrared at least every 12 months. Here's how data centers set intervals for UPS, PDU, STS and busway, and what auditors look for.
Read the guideFAQ
UPS battery services: common questions
How often should data center UPS batteries be tested?
Most data centers test UPS batteries quarterly or twice a year, with a capacity test on a longer cycle. For VRLA batteries, IEEE 1188 calls for quarterly checks that include an ohmic reading on every jar, a yearly check of connection resistance, and periodic capacity tests. Wet cell batteries follow IEEE 450, lithium-ion follows the manufacturer's schedule, and the battery manufacturer's instructions come first for every chemistry. You set the cadence; we recommend one based on chemistry, age and how critical the load is.
When should UPS batteries be replaced?
Replace a string when it can no longer deliver 80% of its rated capacity, the industry's end-of-life point, or sooner when jars show a sustained rise in internal resistance, physical damage or leakage. Standard VRLA jars in UPS service typically last three to five years; long-life VRLA and lithium-ion designs last longer. Trended ohmic readings show which jars are aging out, so a single weak jar can be replaced before it takes the whole string down.
Can UPS batteries be replaced without an outage?
Usually, yes. With multiple strings, one string is replaced at a time while the others stay online. Single-string systems are usually moved to maintenance bypass for the swap window. The approach depends on your UPS design and redundancy, so we plan it with your team and write it into the MOP before any batteries are touched.
What is the difference between impedance testing and a load bank test?
An ohmic (impedance) test is a fast reading on each jar while the string stays online. Trended over time, it shows which jars are deteriorating. A capacity, or load bank, test discharges the string at a known rate to measure how long it actually runs. It is the only direct proof of capacity, so it is done at installation and periodically after that, while ohmic testing runs every visit.
Do you service lithium-ion UPS batteries?
Yes. Lithium-ion UPS batteries are managed by a battery management system (BMS), so maintenance centers on downloading and reviewing BMS event and alarm logs, plus physical inspection, connection checks, infrared and module replacement. We also service VRLA, flooded wet cell and nickel-cadmium batteries.
Can an infrared scan tell if a UPS battery is bad?
Partly. Infrared finds hot terminals, loose intercell connections and jars running warmer than their neighbors, which are early signs of trouble. It cannot measure capacity or remaining runtime. That's why we pair infrared with ohmic testing on every visit and capacity testing on cycle.
What happens to the old batteries?
We remove, package and transport them for recycling, and you receive a certificate of recycling for your environmental records. Lead-acid batteries are among the most recycled products in the country, so almost all of the material is recovered.
What do you need to quote UPS battery service?
The UPS make and model, the battery model and quantity, the number of strings, the site location, any active alarms or known issues, and your preferred service window. A photo of the battery cabinet label usually answers most of it.
Next step
Tell us about your site.
Send a gear list, a one-line or just the address. We scope it with you, and you get a written scope and price, usually within one business day.